PHASE IV BUILDING PROJECT SCOPE
Elementary School
Site Work
Reconfigure
parking lot
to add spaces, resurface
Sitework
and drainage at play areas
New
digital sign
Building Envelope
Replace
original windows at 1955 building
Replace
roofs and skylight at kindergarten wing and gymnasium
Interior Work
Renovate
classrooms and corridors in original 1955 building
Add
interactive whiteboards and projectors at classrooms
Replace
doors and hardware
Acoustical
panels in cafeteria, renovate walls
Mechanical, Electrical, Plumbing
Replace
balance of 1957 hot/cold water piping
Replace
unit ventilators and upgrade control system at 1980 classroom wing
Replace
hot water heaters
Asbestos
abatement allowance
Jr./Sr. High School
Site Work
Repair
stone steps at east entry
Building Envelope
Replace
existing windows
Repair
cracks at north wall new cafeteria
Repair
stonework at 1936 building
Interior Work
Replace
lockers
Replace
ceiling at 2nd floor corridor
Renovate
classrooms
Renovate
science rooms
Replace
doors and hardware
Replace
VAT at classrooms, stairs, and 2nd floor corridor
Upgrade
auditorium and stage lighting , replace stage rigging, refinish
stage floor
Restore
auditorium seating
Mechanical, Electrical, Plumbing
Replace
clock system
Replace
balance of unit ventilators older than 1995, replace coils in 1995
UVs
Air
Conditioning: gymnasium,
auditorium, cafeteria,
kitchen
Provide
ceiling fans for east-facing classrooms
Replace
emergency lights on 1976 central battery system
Architectural
work, including abatement, for AC
Fire
standpipe system
Solar
panels
New
Concession Stand
New
all-weather
field
New
6-lane running track with 8 lane straight
New
artificial turf field
Lighting
New
baseball field
Backstop
Sideline
fence
Storm
water - subsurface drainage
Retaining
wall
Project Total $18,905,000